Builders in Reigate, Redhill and the RH area
Extensions, renovations and repairs, built properly
From a new kitchen extension to a slipped roof tile, Bloom Building & Maintenance looks after homes across Surrey and West Sussex. One team, a written quote and a tidy site.
- Written, itemised quotes
- One point of contact
- Tidy, protected sites
- Local to the RH area
Planning an extension, loft or renovation?
Book a survey visit and get a written, itemised quote.
Your project
is our business.
About Bloom
Building and maintenance for homes across the RH area
Bloom Building & Maintenance Ltd builds extensions, loft conversions, kitchens and bathrooms, and looks after the houses around them afterwards: the repairs, roofs and gutters that keep a good house in good order.
We work for homeowners, landlords and letting agents in Reigate, Redhill, Dorking, Horley and the villages around them, so we know the local councils, the local houses and the local suppliers.
- A written, itemised quote before anything starts
- One person to talk to from survey to sign-off
- Planning, Building Regulations and party walls lined up for you
- Tidy, protected sites, cleared at the end of each day
What we do
Our services
From a new extension to a slipped roof tile, the same team handles the work, the trades and the paperwork.
Extensions
Single-storey, side return, wraparound and two-storey extensions built to match your house.
Loft conversions
Rooflight, dormer and hip-to-gable conversions, from steels and stairs to the last coat of paint.
Kitchens and bathrooms
Strip-out, plumbing, electrics, plastering, tiling and fitting, handled by one team.
Renovations
Whole-house refurbishments, knock-throughs and careful repairs to period homes.
Maintenance and repairs
Repairs for homeowners, landlords and letting agents, from leaks and rot to doors and gutters.
Roofing and exterior
Tile-hanging and roof repairs, flat roofs, gutters, fascias, chimneys and repointing.
How it works
How a job runs
A typical extension or refurbishment, from first call to final snag.
- Visit and survey We see the job, measure up and talk through what you want, a likely budget and what needs approval.
- Written quote An itemised price with a start date, a programme and a list of anything not included.
- Approvals and booking Planning, Building Regulations and party wall notices are lined up before the start date.
- The build A weekly update from your contact, and an early call if anything affects the price or the dates.
- Sign-off We walk the finished job with you, put right any snags and hand over the completion paperwork.
Our speciality
Extensions built to suit your house
Most extensions are about making the ground floor work better. We build them to match the bricks, tiles and roof lines of the house, and line up the planning, Building Regulations and party wall notices before we start.
Rear extensions
Kitchen-diners that open onto the garden, with bifolds and roof lanterns.
Side returns
Fill the side alley of a Victorian or Edwardian house and double the kitchen.
Two-storey extensions
A bigger living space below and an extra bedroom above.
Why Bloom
What you can expect
Written, itemised quotes
Every line priced, with what’s included and what isn’t, before work starts.
One point of contact
The same person from the survey visit to sign-off, on the phone or WhatsApp.
Approvals lined up
Planning, Building Regulations and party wall notices sorted before the start date.
Tidy, protected sites
Floors covered, dust sheeted and cleared at the end of each day.
Weekly updates
A short update every week, and an early call if anything changes the price or dates.
Local to the RH area
Based around Reigate and Redhill, working across Surrey and West Sussex.
Where we work
Areas we cover
The RH postcode area of Surrey and West Sussex. If you’re just outside it, ask anyway.
- RH1 Redhill, Merstham, Earlswood, Bletchingley
- RH2 Reigate, Woodhatch, Reigate Heath
- RH3 Betchworth, Brockham
- RH4 Dorking, Westcott
- RH5 Capel, Holmwood, Beare Green, Newdigate
- RH6 Horley, Smallfield, Charlwood
- RH7 Lingfield, Dormansland
- RH8 Oxted, Limpsfield, Hurst Green
- RH9 Godstone, South Godstone
- RH10 Crawley east, Three Bridges, Copthorne
- RH11 Crawley west, Ifield, Broadfield
- RH12 Horsham, Warnham, Broadbridge Heath
Read our reviews on Google
Reviews from our customers are on our Google Business Profile, where we can’t edit or choose them.
Advice
Local guides
Plain-English help with planning, Building Regulations, party walls and older houses in the RH area.
-
Hello world!
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
Questions
Questions we’re often asked
Can’t see yours? Ask us when you get in touch.
Which areas do you cover?
The RH postcode area: Reigate, Redhill, Merstham, Dorking, Horley, Oxted, Godstone, Lingfield, Crawley, Horsham and the villages in between. If you’re just outside it, ask us anyway.
How do I get a quote?
Book a survey visit with the form on this page, call or send us a WhatsApp. We’ll see the job, measure up and send a written, itemised quote afterwards.
Do I need planning permission for a single-storey extension?
Often not. Under permitted development, a single-storey rear extension can usually go up to 3 metres beyond the original rear wall of a semi-detached or terraced house, or 4 metres for a detached house, and no higher than 4 metres. Larger ones, up to 6 or 8 metres, need prior approval from the council.
These rights are reduced in conservation areas and the Surrey Hills National Landscape, so check with your council before you commit.
Will my project need Building Regulations approval?
Most extensions, loft conversions and structural alterations do, even when planning permission isn’t needed. Approval comes from the council’s building control team or a registered building control approver, who inspect the work at key stages and issue a completion certificate. Keep it safe: you’ll need it when you sell.
What is a party wall notice, and do I need one?
If you’re working on a wall you share with a neighbour, building on the boundary, or digging foundations within 3 metres of their building (or 6 metres for deeper foundations), the Party Wall etc. Act 1996 says you must give them written notice first: two months before work on a shared wall, and one month for new boundary walls and excavations.
Do you take on small repair jobs?
Yes. Maintenance is half of our name. Leaks, rotten timber, slipped tiles, sticking doors and blocked gutters are all worth sorting before they turn into bigger jobs.
Book a survey visit
Tell us about your project
Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.